This manual gives the checkout procedure for the 'B' series Launcher Hydraulic and Pneumatic Systems. The procedures determine the operational readiness of the launcher hydraulic and pneumatic systems. All personnel involved in this checkout must be thoroughly familiar with these procedures and applicable safety rules to minimize the possibility of injury to personnel or damage to equipment. (Author)
Checkout Procedure for the 'B' Series Launcher Hydraulic and Pneumatic Systems
1958
28 pages
Report
No indication
English
Missile Technology , Missile Launching & Support Systems , Surface to surface missiles , Guided missile launchers , Hydraulic equipment , Pneumatic devices , Operational readiness , Ground support equipment , Checkout procedures , Bleed systems , Release mechanisms , Structural members , Stabilization systems , Pressurization , Valves , Nitrogen , Instruction manuals , Xsm-65b missiles