The report is a supplement to 'Implementation and Operation of a Demand Responsive Public Transportation System (Haddonfield Dial-A-Ride).' The report shows the logic flow of all phases of a manually controlled Dial-A-Ride. The logical design of the Dial-A-Ride Control System is the heart of the system design. From it stem the procedures and training materials. The shorthand notational system employed is presented. Arrow flow diagrams show the time sequence and events in the system. With use of these diagrams, questions of timing, branching to new procedures, flow of documents and information storage can be studied. Personnel and equipment requirements can be determined. Results of time studies made during simulation are presented.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Implementation and Operation of a Demand Responsive Public Transportation System (Haddonfield Dial-A-Ride). Supplement F. Procedure Logic Design


    Publication date :

    1974


    Size :

    88 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English