The traffic model check was made to determine if the models developed for the 1990 plan could be used for the 2000 plan. A comparison was made of the models using 1970 socio-economic data and the results of the models to 1970 ground counts. Trip generations and distributions were checked and adjusted slightly. Traffic assignment checks, screenline and cut line checks were also made. It was realized that a more extensive and coordinated traffic counting program is needed especially during the model check years. The results of the model check were positive with only minor improvements needed to use it for the 2000 plan.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    1970 Model Check


    Publication date :

    1972


    Size :

    64 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Check, check and double check

    Verwey, Adri / International Association for Hydro-Environment Engineering and Research (IAHR) | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2012

    Free access

    Check, check and double check

    Verwey, Adri | BASE | 2012

    Free access

    ALCOHOL CHECK SYSTEM, ALCOHOL CHECK APPLICATION

    UMAGOME SATOSHI / TAUCHI MAKIKO / KAMOTO JUNKO et al. | European Patent Office | 2024

    Free access


    CHECK OF THE MATHEMATICAL MODEL ADEQUACY

    M. S. Kublanov | DOAJ | 2016

    Free access