Results are summarized herein of 36 supplementary test borings and five test pits made at various locations within the area of the planned Greenbelt Service and Inspection Yard in Section E011 of Greenbelt Route. Facilities investigated include the storage and circulation tracks, and yard structures including a maintenance shop, operations and control building, tiebreaker stations, fueling facility, temporary car wash facility, access road and bridge over Indian Creek and the parking lot.
Supplementary Subsurface Investigation, Section E011, Greenbelt Route, Greenbelt Service and Inspection Yard
1987
62 pages
Report
No indication
English
Subsurface Investigation, Section E001a, Greenbelt Route
NTIS | 1981
|Tema Archive | 1996
|British Library Online Contents | 2001