The Heavy Lift Replacement (CH-53K) program mission is to generate and support a robust United States Marine Corps heavy-lift capability. The primary mission, is vertical heavy lift. The program includes improvements in lift and range capabilities, commonality, reliability, maintainability, interoperability, ship integration, survivability, and force protection. The CH-53K helicopter will be a replacement for the CH-53E.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    CH-53K Heavy Lift Replacement Helicopter (CH-53K)


    Contributors:
    R. Pridgen (author)

    Publication date :

    2013


    Size :

    35 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Heavy-Lift Helicopter Power Systems

    Stein, Dennis | SAE Technical Papers | 1974


    Heavy Lift Helicopter Main Engines

    Woodley, David R. / Castle, William S. | SAE Technical Papers | 1973


    The Role of the Heavy Lift Helicopter

    Gustafson, E. E. | SAE Technical Papers | 1972


    Multi-Helicopter Heavy Lift System Feasibility Study

    K. Korsak / K. R. Meenen / D. N. Meyers et al. | NTIS | 1972


    Design of the Atlas Maritime Heavy Lift Helicopter

    Hein, B. / Rosenfeld, N. / Parsons, E. et al. | British Library Conference Proceedings | 2006