A computer model was developed to quantify the transportation hardware requirements and transportation costs associated with shipping spent fuel in the commercial nucler fuel cycle in the near future. Results from this study indicate that alternative spent fuel shipping systems (consolidated or disassembled fuel elements and new casks designed for older fuel) will significantly reduce the transportation hardware requirements and costs for shipping spent fuel in the commercial nuclear fuel cycle, if there is no significant change in their operating/handling characteristics. It was also found that a more modest cost reduction results from increasing the fraction of spent fuel shipped by truck from 25% to 50%. Larger transportation cost reductions could be realized with further increases in the truck shipping fraction. Using the given set of assumptions, it was found that the existing spent fuel cask fleet size is generally adequate to perform the needed transportation services until a fuel reprocessing plant (FRP) begins to receive fuel (assumed in 1987). Once the FRP opens, up to 7 additional truck systems and 16 additional rail systems are required at the reference truck shipping fraction of 25%. For the 50% truck shipping fraction, 17 additional truck systems and 9 additional rail systems are required. If consolidated fuel only is shipped (25% by truck), 5 additional rail casks are required and the current truck cask fleet is more than adequate until at least 1995. Changes in assumptions could affect the results. Transportation costs for a federal interim storage program could total about $25M if the FRP begins receiving fuel in 1987 or about $95M if the FRP is delayed until 1989. This is due to an increased utilization of federal interim storage facility from 350 MTU for the reference scenario to about 750 MTU if reprocessing is delayed by two years. (ERA citation 08:014054)
Analysis of Near-Term Spent Fuel Transportation Hardware Requirements and Transportation Costs
1983
96 pages
Report
No indication
English
Radiation Shielding, Protection, & Safety , Radioactive Wastes & Radioactivity , Road Transportation , Spent fuels , Spent fuel casks , Transport , Cost , Spent fuel elements , Rail transport , Road transport , Transportation systems , Computerized simulation , Availability , ERDA/050900 , ERDA/051000 , ERDA/210100 , ERDA/210200
Spent Fuel Transportation Problems
NTIS | 1977
|Intermodal Transportation of Spent Fuel
NTIS | 1983
|Development of spent fuel transportation technology
NTIS | 1994
|