The purpose of the project is to replace a hazardous and substandard section of highway which it is no longer practical to maintain in order to provide a reasonable service for present and future highway transportation. Construction of this project would require about 156 acres of agricultural land which would be lost to production. During construction operations some temporary accelerated erosion may occur. Three families would be displaced.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Illinois State Line. Monroe Road, S.T.H. 69. Green County, Wisconsin


    Publication date :

    1971


    Size :

    25 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English