Before conducting the missile composite checkout, successful performance of each individual system installed on the missile must be determined. The following is a list of the procedures used for acceptance testing of each system: Electrical system; Flight control system; Inertial guidance system; Propellant utilization system; and Propulsion system. (Author)
Factory Acceptance Testing of Missile 31F
1961
35 pages
Report
No indication
English
Factory Acceptance Testing of Missile 105D
NTIS | 1961
Factory Acceptance Testing of Missile 141D
NTIS | 1961
Factory Acceptance Testing of Missile 23F
NTIS | 1961
Factory Acceptance Testing of Missile 58E
NTIS | 1961
Factory Acceptance Testing of Missile 37E
NTIS | 1961