Measurements were made during the summer of 1973 of speed/flow relations for traffic on improved and unimproved sections of the A66 Penrith-Cockermouth road. This work formed part of a study being undertaken to establish whether there is a difference between speed/flow relations for recreational and other rural roads. Observed speeds appeared to be more than 10 per cent lower than speeds predicted by established methods for rural roads of comparable standard outside recreational areas.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Speed/Flow Relations on Recreational Roads


    Contributors:

    Publication date :

    1974


    Size :

    15 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Speed/flow relations on recreational roads

    Forsgate, J. A. / Hammond, J. N. | TIBKAT | 1974


    Design Guidelines for Recreational Roads

    J. McNamara / A. Moore / J. Baerwald | NTIS | 1975



    Speed on roads

    Pomeroy, L.H. | Engineering Index Backfile | 1934


    Speed-Flow Modeling of Arterial Roads in Singapore

    Lum, K. M. / Fan, H. S. L. / Lam, S. H. et al. | British Library Online Contents | 1998