The Washington State Department of Transportation (WSDOT) designed and installed Service Level (SL-1) bridge rails on three treated timber bridges in the state. To date, there have been no accidents or maintenance problems reported at any of the modified bridges.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Traffic Barrier Systems Service Level 1 (SL-1) Bridge Rail, January 1987-August 1988


    Contributors:
    D. Gripne (author)

    Publication date :

    1988


    Size :

    14 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English





    Tentative service requirements for bridge rail systems

    Olson, Robert M. / Post, Edward R. / McFarland, William F. | TIBKAT | 1970



    Fahrplanauszüge für den Entlastungsverkehr 1987/88 : Weihnachten, Neujahr 1987/88, Winterferien 1988, Ostern 1988, Frühjahrsferien 1988, Pfingsten 1988

    Deutschland, Hauptstab für die Operative Betriebsleitung der Deutschen Reichsbahn / Deutsche Reichsbahn | SLUB | 1987


    High-Performance Aesthetic Bridge Rail and Median Barrier

    Lechtenberg, Karla A. | Online Contents | 2009