The results of an AGARD Working Group, (WG.22) directed by the Structures and Materials Panel are presented. The Working Group was tasked to develop design requirements and qualification methods the application of which, across NATO, would improve aircraft utilization and interoperability. The subject of repaired-runway operation is developed and illustrated; its sections reflect the various aims of the Working Group while the appendices amplify particular aspects. Throughout, topics are discussed from fundamentals so that it may provide an introduction to the structural and dynamical implications of repaired-runway operation as well as a statement of the current level of development of techniques in design, assessment, and operational clearance.
Aircraft Operations on Repaired Runways
1990
119 pages
Report
No indication
English