The Missouri Pacific Railroad has developed and is implementing a computerized system which will enhance freight car scheduling and overall service. This document describes the results of an Advanced Systems Study task, the purpose of which was to examine possible further exploitation of the car scheduling system developed under the contract. Reports of six areas examined identify important ways in which car scheduling could possibly be exploited. Missouri Pacific has not yet committed to develop the capabilities as described.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Missouri Pacific's Computerized Freight Car Scheduling System: Advanced Systems Study


    Publication date :

    1980


    Size :

    133 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English