The implementation of traffic operations improvements on New Jersey Route 3 is covered in this report. Four traffic demonstrations were conducted: dedicating a mainline lane to entering traffic, closing to entering traffic ramps, and restriping a major merge. This volume is the second in a five-volume set covering the traffic demonstration studies and surveillance and control design for the New Jersey Route 3 Urban Corridor Demonstration Program.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Urban Corridor Demonstration Program Manhattan CBD-North Jersey Corridor, New Jersey Route 3 Traffic Demonstrations. Volume II


    Publication date :

    1975


    Size :

    54 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English