Any refiner or importer planning to produce or import highway diesel fuel after June 1, 2006 and/or 15 ppm nonroad, locomotive, or marine (NRLM) diesel fuel after June 1, 2010 is required to submit to the U.S. Environmental Protection Agency (EPA or the Agency) annual pre-compliance reports. Reports were due from 2003 through 2005 for the highway diesel rule and are due from 2005 through 2011 for the nonroad diesel rule by June 1 of each year. This report summarizes the results of the June 2005 pre-compliance reports, the final set of the highway reports and the first set of the nonroad reports. An overview of these results was presented at the 2005 ULSD Workshop, November 10-11, 2005.
Summary and Analysis of the 2005 Highway and Nonroad Diesel Fuel Pre-Compliance Reports
2006
56 pages
Report
No indication
English
Control of Advanced EGR System at Nonroad Diesel Engine
SAE Technical Papers | 2011
|British Library Conference Proceedings | 1998
|SAE Technical Papers | 1998
|Automotive engineering | 1998
|