This report contains the results of the inspection of three fleet moorings located within the Naval Submarine Base Kings Bay, Georgia. A CHESDIVNAVFACENGCOM-assigned Engineer-in-Charge and divers from Underwater Construction Team One conducted the inspection from 9 to 11 April 1985. All three moorings are in good condition with the exception of the two 'F' Class mooring buoys. A summary of the inspection results is provided. The two 'F' Class mooring buoys have been recommended for overhaul during the next maintenance period. Detailed information and specific comments concerning each of these moorings are included. Keywords: Fleet moorings; Mooring systems; Mooring inspection; Underwater inspection; Naval Submarine Base Kings Bay.
Naval Submarine Base Kings Bay Fleet Moorings Underwater Inspection Report
1985
46 pages
Report
No indication
English