The objectives of this portion of the project were to: (1) Determine if the subject variant of the Modified Kansas Corral (MKC) railing complies with the requirements of the AASHTO LRFD Bridge Design Specifications and NCHRP Report 350, Test Level 4; (2) Prepare a comprehensive report of the research findings that is suitable for submittal to the FHWA by the FDOT as part of a request for acceptance package; (3) If required, perform a full-scale crash test to verify the crash performance of the MKC railing.
Evaluation of the FDOT Variant of the Modified Kansas Corral Bridge Railing
2004
52 pages
Report
No indication
English
Texas streamlines bridge railing
Engineering Index Backfile | 1941
|NTIS | 1965
|Enhancement to FDOT Truck Weighing Program
NTIS | 1989
|Selection Table Development for Bridge Railing
Transportation Research Record | 2014
|