Baseline definition and system optimization are used for the analysis of programmed holds developed through prelaunch system analysis. Identification of design specifications for ground support equipment and maintenance concepts, and design specifications are used to describe the functional utilization of the overall flow process.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Programmed schedule holds for improving launch vehicle holds


    Contributors:

    Publication date :

    1969-11-01


    Type of media :

    Miscellaneous


    Type of material :

    No indication


    Language :

    English


    Keywords :