Abort criteria necessary to satisfy space shuttle program requirements to include intact vehicle abort capability are discussed. Intact abort implies the ability of the booster and orbiter to separate and both continue flight to a safe landing, with a full payload aboard the orbiter. Obviously, the requirement to separate early along the ascent trajectory presupposes critical operational problems that are probably booster problems and may preclude booster recovery. On the other hand, some critical problems while mated can become manageable when separated and should result in full booster recovery. All critical orbiter problems fall into this category; since stage separation without orbiter thrust is a capability of some separation system concepts, booster stage recovery following separation is a requirement.
Booster recovery following premature space shuttle stage separation
1972-02-01
Conference paper
No indication
English
Space Shuttle booster recovery planning.
NTRS | 1973
|Space Shuttle booster recovery planning
AIAA | 1973
|Space shuttle booster separation motor design
AIAA | 1976
|Space shuttle booster separation motor design
NTRS | 1976
|