The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.
A scientific operations plan for the large space telescope
Annual Meeting on Space shuttle missions of the 80''s ; 1975 ; Denver, CO
1977-01-01
Miscellaneous
No indication
English