The space Transportation System 1 Flight onorbit mission phase is broken into three distinct subphases; those subphases being the rev 1 through rev 6 contigency reentry opportunities, the general onorbit time period, and the rev 34 to the postdeorbit Guam pass inclusive. The necessary information to ensure that sufficient data tables are accummulated in real time to support the postmission off line ancillary data analysis studies designed to support postmission ancillary data generation and investigation of mission related anomalies is given.
STS-1 Low-Speed Ground Navigation Console Procedures
1980-08-01
Report
No indication
English
Sts-1 Low-Speed Ground Navigation Console Procedures
NTIS | 1980
|Console to simplify navigation
Engineering Index Backfile | 1957
|MULTI-FUNCTION CONSOLE FOR e-NAVIGATION AND KEYBOARD CARTRIDGE FOR MULTI-FUNCTION CONSOLE
European Patent Office | 2018
|European Patent Office | 2018
|The Design of a Marine Integrated Navigation Console^*
British Library Conference Proceedings | 2001
|