The development of a model for the cost-effective management of space venture risks is discussed. The risk assessment and control program of insurance companies is examined. A simplified system development cycle which consists of a conceptual design phase, a preliminary design phase, a final design phase, a construction phase, and a system operations and maintenance phase is described. The model incorporates insurance safety risk methods and reliability engineering, and testing practices used in the development of large aerospace and defense systems.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Cost effective management of space venture risks


    Contributors:

    Publication date :

    1986-01-01


    Type of media :

    Conference paper


    Type of material :

    No indication


    Language :

    English