This paper discusses the development of the Assured Shuttle Availability Project (ASA). The ASA project has been created to provide a structure by which the Space Shuttle Program (SSP) may allocate resources to hardware redesign efforts required to extend effective Space Shuttle operational life through the year 2020. Specific ASA Project goals and evaluation criteria have been set, and redesign efforts have been evaluated using systems engineering methods.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Assured Shuttle Availability Project


    Contributors:

    Publication date :

    1990-07-01


    Type of media :

    Conference paper


    Type of material :

    No indication


    Language :

    English




    Assured Shuttle Availability Project

    SCOTT, JOHN | AIAA | 1990




    Quality Assured

    British Library Online Contents | 1997


    Integrity assured!

    Emerald Group Publishing | 2005