Due to the short flight of Space Shuttle Columbia, STS-83, in April 1997, NASA chose to refly the same crew, shuttle, and payload on STS-94 in July 1997. This was the first reflight of an entire mission complement. The reflight of the First Microgravity Science Laboratory (MSL-1) on STS-94 required an innovative approach to Space Shuttle payload ground processing. Ground processing time for the Spacelab Module, which served as the laboratory for MSL-1 experiments, was reduced by seventy-five percent. The Spacelab Module is a pressurized facility with avionics and thermal cooling and heating accommodations. Boeing-Huntsville, formerly McDonnell Douglas Aerospace, has been the Spacelab Integration Contractor since 1977. The first Spacelab Module flight was in 1983. An experienced team determined what was required to refurbish the Spacelab Module for reflight. Team members had diverse knowledge, skills, and background. An engineering assessment of subsystems, including mechanical, electrical power distribution, command and data management, and environmental control and life support, was performed. Recommendations for resolution of STS-83 Spacelab in-flight anomalies were provided. Inspections and tests that must be done on critical Spacelab components were identified. This assessment contributed to the successful reflight of MSL-1, the fifteenth Spacelab Module mission.
Reflight of the First Microgravity Science Laboratory: Quick Turnaround of a Space Shuttle Mission
Society of Women Engineers Convention ; 1998 ; Houston, TX, United States
1998-04-01
Preprint
No indication
English
Mission Science on the First International Microgravity Laboratory
Online Contents | 1993
|Mission science on the first international microgravity laboratory
Elsevier | 1993
|Ecureuils support Antarctic science mission - Followed 20-hr.-day, quick turnaround schedule
Online Contents | 1995
Shuttle ground turnaround operations
NTRS | 1974
|