Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    A Two-Phase Iterative Heuristic Approach for the Production Routing Problem



    Published in:

    Publication date :

    2014




    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English



    Classification :

    Local classification TIB:    770/1935/7000
    BKL:    55.80 / 55.80 Verkehrswesen, Transportwesen: Allgemeines



    A Two-Phase Iterative Heuristic Approach for the Production Routing Problem

    Absi, N. / Archetti, C. / Dauzère-Pérès, S. et al. | British Library Online Contents | 2015


    Iterative Local-Search Heuristic for Weighted Vehicle Routing Problem

    Wang, Xinyu / Shao, Shuai / Tang, Jiafu | IEEE | 2021


    [229] HEURISTIC APPROACH FOR THE ENVIRONMENTAL VEHICLE ROUTING PROBLEM

    Chaouachi, Jouhaina / Fatnassi, Ezzeddine | TIBKAT | 2016


    Reoptimization Heuristic for the Capacitated Vehicle Routing Problem

    Rodrigo Linfati / John Willmer Escobar | DOAJ | 2018

    Free access

    Hybrid Heuristic Algorithm for solving Capacitated Vehicle Routing problem

    AbdElAziz, Moh. M. / A. El-Ghareeb, Haitham / Ksasy, M. S. M. | BASE | 2014

    Free access