Abstract Development strategy for the port of Gdańsk assumes that , up to 2027, it will become the main transport centre in the Baltic Sea region. To this end , for many years work has been carried out to facilitate access to the port both by sea and land. One of the elements of extension of the port is the building of another terminal of Deepwater Container Terminal, Gdańsk. In this task, geotechnical operations aimed at appropriate preparation of subgrade for storage of containers and operation of cranes, have been especially important. Effectiveness of the assumed design solution of land-side girder for gantry crane has been verified by means of a technical monitoring system. This paper presents main elements of design the land-side girder of a new quay of the container terminal in Gdańsk, together with its computational analysis, as well as the results collected during a few months of observation, which have revealed real work of monitored elements.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Technical Monitoring System for a New Part of Gdańsk Deepwater Container Terminal


    Contributors:

    Published in:

    Polish Maritime Research ; 24 , s1 ; 149-155


    Publication date :

    2017




    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    Unknown


    Classification :

    BKL:    55.40 Schiffstechnik, Schiffbau / 50.92 Meerestechnik



    Technical Monitoring System for a New Part of Gdańsk Deepwater Container Terminal

    Miśkiewicz Mikołaj / Pyrzowski Łukasz / Wilde Krzysztof et al. | DOAJ | 2017

    Free access



    The Virtual Model of Deep Water Container Terminal T2 in Port Gdańsk

    Piotr Zwolan / Krzysztof Czaplewski | DOAJ | 2018

    Free access