Maintainability Control in Design can be achieved by means of a formal procedure which utilizes all relevant talents available within a corporation. The procedure must have management support and proper funding. Effective maintenance engineering analysis is a primary element in maintainability control. The plan for use and the plan to maintain are key factors for consideration as is the maintenance capability of the customer.Examples of effective results are used to demonstrate maintainability control in action.
Maintainability Control in Design
Sae Technical Papers
SAE World Congress & Exhibition ; 1964
1964-01-01
Conference paper
English
IuD Bahn | 2003
|SAE Technical Papers | 1989
|Aircraft design for maintainability
AIAA | 1991
|Maintainability in Aerospace Design
Online Contents | 1998
|Engine design for maintainability
Online Contents | 1994