A punched tape program is being used to control power shift transmission test stands operating as single or multiple units. Any desired shift sequence (sequence or skip shifting) is availabel with no concern for rate of shift lever movement, accuracy of detent postions, etc. Transmission shifting is accomplished by using electric solenoid valves to control the shift valves. Test unit design and construction, the test controller, test cycle design, test results, laboratory-field correlation, engine, costs, and test stand deficiences are covered. This system provides test flexibility, rapid data acquisition, engine life data, and minimum equipment investment.
Punched Tape Control of Power Shift Transmission Test Stands
Sae Technical Papers
1973 SAE International Off-Highway and Powerplant Congress and Exposition ; 1973
1973-02-01
Conference paper
English
Data Acquisition Using Punched Paper Tape
SAE Technical Papers | 1967
|Motorized shoulder belt runs on punched tape
Automotive engineering | 1980
|Star catalogs on punched card and magnetic tape
TIBKAT | 1961
|The punched-paper-tape legacy of military information systems
Tema Archive | 1988
|