Due to the growing importance of maritime container transportation in the logistics system, berth and quay crane scheduling issues have been a focus of research until now. In this paper, we construct a continuous berth and quay crane joint scheduling optimization model considering carbon emission cost. Minimizing the vessel carbon emission cost, terminal operation cost and the cost of time in port for vessel are taken as multiple objectives in the model. After that, the improved immune particle swarm algorithm is used to solve the example of a port in Zhejiang to verify the effectiveness of the model and algorithm in this paper. This paper provides a reference for constructing green port.
Multi-objective optimization of joint scheduling of berth and quay crane under green ports
Seventh International Conference on Traffic Engineering and Transportation System (ICTETS 2023) ; 2023 ; Dalian, China
Proc. SPIE ; 13064
2024-02-20
Conference paper
Electronic Resource
English
Heuristics for quay crane scheduling at indented berth
Online Contents | 2011
|Integrating berth allocation and quay crane assignments
Online Contents | 2010
|The Integrated Berth and Quay Crane Scheduling Problem in Container Terminals
Trans Tech Publications | 2014
|The simultaneous berth and quay crane allocation problem
Online Contents | 2008
|