Spacelab (SL) ground processing is active at the Kennedy Space Center (KSC). The palletized payload for the second Shuttle launch is staged and integrated with interface verification active. The SL Engineering Model is being assembled for subsequent test and checkout activities. After delivery of SL flight elements from Europe, prelaunch operations for the first SL flight start with receipt of the flight experiment packages and staging of the SL hardware. Experiment operations consist of integrating the various experiment elements into the SL racks, floors and pallets. Rack and floor assemblies with the experiments installed, are integrated into the flight module. Aft end-cone installation, pallet connections, and SL subsystems interface verifications are accomplished, and SL-Orbiter interfaces verified. The Spacelab cargo is then transferred to the Orbiter Processing Facility (OPF) in a controlled environment using a canister/transporter. After the SL is installed into the Orbiter payload bay, physical and functional integrity of all payload-to-Orbiter interfaces are verified and final close-out operations conducted. Spacelab payload activities at the launch pad are minimal with the payload bay doors remaining closed. Limited access is available to the module through the Spacelab Transfer Tunnel. After mission completion, the SL is removed from the Orbiter in the OPF and returned to the SL processing facility for experiment equipment removal and reconfiguration for the subsequent mission.
Spacelab Ground Processing
NASA-ESA Spacelab Systems and Programs ; 1981 ; Washington,D.C.,United States
Proc. SPIE ; 0284
1982-02-01
Conference paper
Electronic Resource
English
NTRS | 1982
|NTRS | 1979
|Materials processing in Spacelab
Tema Archive | 1977
|Spacelab Data Processing Facility
NTIS | 1983
Space processing payloads for Spacelab
NTRS | 1974
|