The Singapore-Malaysia Second Link is a prestressed bod girder carrying a dual carriageway with three lanes on each carriage. The bridge serves as a relief to the existing crossing locate in northern Singapore. The bridge was compete in 1997 and opened to traffic in the same year. Owing to its importance a suite of instruments was installed in three segments of the bridge in order to monitor its short-term and long-term behavior and performance under construction loads, environmental loads, and vehicular loads. The paper present a description of the instrumentation, results of the monitoring during construction, and observations of the bridge response to loading during construction.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Monitoring of Singapore-Malaysia second link during construction


    Contributors:

    Conference:

    Second International Conference on Experimental Mechanics ; 2000 ; Singapore,Singapore


    Published in:

    Publication date :

    2001-06-13





    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English