Abstract The aim of this paper is to present the recent literature that has advanced in the field of maritime logistics, specifically with regards to the consideration of vessel stability during the process of unloading and/or loading containers onto vessels. This process is essentially known as the Quay Crane Scheduling Problem (QCSP) which determines the operational profile of each quay crane in terms of the container tasks and timing. The literature on this and other problems pertaining to quayside operational planning is presented, before introducing the works with a contribution in ship stability. The works are described with insights into their formulation and solution techniques, as well as their contribution to the literature. Most importantly, the results are discussed and directions are provided for future work in the area.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Ship Stability Considerations in the Quay Crane Scheduling Problem


    Contributors:


    Publication date :

    2017-09-05


    Size :

    9 pages





    Type of media :

    Article/Chapter (Book)


    Type of material :

    Electronic Resource


    Language :

    English





    Quay crane diving platform and quay crane

    TENG XUCHUN / LEI QUANWEN / WENG WUWEI et al. | European Patent Office | 2023

    Free access

    QUAY CRANE AND CONTROL METHOD FOR QUAY CRANE

    MATSUURA MASAHIRO | European Patent Office | 2018

    Free access

    Quay crane and quay crane control method

    SATO SOSHI / KUBO HIROSHI / WATANABE SATOSHI et al. | European Patent Office | 2015

    Free access

    QUAY CRANE

    HAYASHI YU / EBIHARA KENJI | European Patent Office | 2017

    Free access