Abstract There are two essential ingredients one must have in interfacing with launch vehicles: money and patience. The selection and manifesting process is long, schedules are uncertain, and a launch failure on an earlier flight could introduce additional years of delay.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Launch Vehicles and Payload Interfaces


    Contributors:


    Publication date :

    2018-01-01


    Size :

    12 pages




    Type of media :

    Article/Chapter (Book)


    Type of material :

    Electronic Resource


    Language :

    English




    Payload optimization of multistage launch vehicles

    Teren, Fred / Spurlock, Omer F. | TIBKAT | 1966


    Payload isolation system for launch vehicles

    Wilke, Paul S. / Johnson, Conor D. / Fosness, Eugene R. | SPIE | 1997


    Payload Isolation System for Launch Vehicles

    P. S. Wilke / E. R. Fosness | NTIS | 1997


    Payload optimization of multistage launch vehicles

    Spurlock, O. F. / Teren, F. | NTRS | 1966


    Payload Optimization of Multistage Launch Vehicles

    O. F. Spurlock / F. Teren | NTIS | 1966