This paper describes the technical features of the new tokaido line: Historical and social background, technical and economic studies about track gauge, route, maximum speed, motive power etc., features of the operation control system and of ground facilities such as the roadbed bridges, tunnels, track, buildings, power source, overhead equipment, signaling facilities, communication facilities, and maintenance of acilities and problems involved.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New tokaido line


    Contributors:
    Fujii, M. (author)

    Published in:

    Publication date :

    1968


    Size :

    21 Seiten, 15 Bilder, 2 Tabellen


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    German




    New Tokaido line

    Kato, I. | Engineering Index Backfile | 1963


    The Tokaido Shinkansen

    Isozaki, A. | British Library Online Contents | 1998


    The Tokaido Shinkansen

    Isozaki, A. / Union Internationale des Chemins de Fer (UIC) / Union des Industries Ferroviaires Europeennes | British Library Conference Proceedings | 1998


    Die neue tokaido-bahn

    Kunimatsu, K. | Tema Archive | 1968


    Long welded rail in New Tokaido line

    Inouye, Z. / Fukazawa, Y. | Engineering Index Backfile | 1968