Aimed to solve problems, such as deep soft soil foundation, strong wind and high wave and urgent construction period confronted in offshore dam construction, deepwater work ship has been researched and developed and further the construction and monitoring system has been innovated to break with traditional design and construction method, plastic drainage slab consolidation technology is to lead middle and low beach into offshore deepwater so as to quickly increase bearing capacity and settlement of the soft soil foundation and complete in construction period. This is characterized by security, reliability, economy and high efficiency.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    New Construction Technique of Soft Soil Foundation Consolidated by Plastic Drainage Slab


    Contributors:


    Publication date :

    2012


    Size :

    8 Seiten




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    Settlement Analysis of Dock Slab on Soft Soil Foundation

    Wang, Hong ;Wang, Lan Huan ;Liu, Lei | Trans Tech Publications | 2012


    Foundation Slab for Lunar Base Construction

    Okumura, M. / Ohashi, Y. / Ueno, T. et al. | British Library Conference Proceedings | 1994


    Prediction of Post-Construction Settlement Based on Parameter Inversion of Soft Soil Foundation

    Chen, Y.-Z. / Cao, H.-H. / Li, Z.-X. et al. | British Library Conference Proceedings | 2010


    Consolidated. Consolidated commodore demonstrated

    Engineering Index Backfile | 1929


    Consolidated. Consolidated commodore demonstrated

    Engineering Index Backfile | 1929