The amount of water and sediment reduce obviously in Ning Meng reach because of the influence of the regulation of Long-Liu reservoir in upper of Yellow River, rainfall and production and living use water, especially the time reduce of large flows and the growth of small flow duration time, resulting main channel siltation and atrophy severe in the Inner Mongolia Reach, lower bankfull discharge, the main channel flooding capacity decreased when the great flood of water level rise, resulting in the increase of the river's ice flood control pressure. The study will provide technical support for flood control decision-making.


    Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    The Capability Analysis of Flood Discharge in Ningmeng of Yellow River


    Contributors:
    Jing, Xin-Ai (author) / Lin, Xiu-Zhi (author) / Hou, Su-Zhen (author) / Liu, Gen-Li (author)


    Publication date :

    2012


    Size :

    5 Seiten




    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English





    Brief Analysis of Environmental Supervision Regarding Flood Control Projects in the Lower Yellow River

    Yuan, D. / Jun, Y. / Xiaoling, L. | British Library Conference Proceedings | 2010


    Analysis of Discharge Capacity and Flood Storage Rate during 2015 Large Flood in the Kinu River

    Tabata, Kosuke / Fukuoka, Shoji / Deguchi, Keisuke | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2016

    Free access


    Flood discharge formulae

    Walker, Thomas. | Engineering Index Backfile | 1922