The DONS system. Designer Of Network Schedules, supports the development of timetables by generating regular interval timetables for the Dutch railway network; it is used to plan improved or new train services and to locate bottlenecks in the railway infrastructure. A new simulation module enables the planners to study the network-wide dynamic properties of DONS timetables. The direct link between DONS and this simulation module, enhanced by the re-use of previously defined DONS concepts and the automatic generation of simulation models from existing data, facilitates an integrated approach towards infrastructure and railway services development, focused on quality improvement.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Improving the Dutch railway services by network-wide timetable simulation

    Hooghiemstra, J. S. / Middelkoop, D. M. / Teunisse, M. J. G. et al. | British Library Conference Proceedings | 1998


    Railway timetable & traffic : analysis, modelling, simulation

    Hansen, Ingo A. ;Pachl, Jörn ;Albrecht, Thomas | SLUB | 2008


    Railway Timetable Optimization

    Reisch, Julian | TIBKAT | 2021

    Free access

    Railway timetable & traffic : analysis, modelling, simulation

    Hansen, Ingo A. ;Pachl, Jörn ;Albrecht, Thomas | TIBKAT | 2008


    Probabilistic Simulation of a Railway Timetable

    Haehn, Rebecca / Ábrahám, Erika / Nießen, Nils | DataCite | 2020