The reasonable speed limit would reduce the detrimental impact on the driving safety and traffic jam in Highway expansion project high slope work zone. The study based on the investigation of Liu Nan highway’s traffic capacity, speed, traffic flow and other related index, which researched the vehicles queuing length of the different lane width in expansion project construction zone. The result is that 1/2 lane occupied need limit speed step by step in the warning area, 1/3 lane occupied limit 60km/h and 1/4 lane occupied limit 80km/h.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Research on Speed Limit of Highway Expansion Project Construction Zone



    Published in:

    Publication date :

    2014-09-19


    Size :

    4 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English




    Optimal Dynamic Speed-Limit Control for Highway Work Zone Operations

    Kang, Kyeong-Pyo / Chang, Gang-Len / Zou, Nan | Transportation Research Record | 2004


    Research on Desired Speed under Speed Limit on Ordinary Highway

    Du, Xuan / Lu, Jian / Tan, Dandan et al. | ASCE | 2010


    Research on Desired Speed under Speed Limit on Ordinary Highway

    Du, X. / Lu, J. / Tan, D. et al. | British Library Conference Proceedings | 2010


    Highway speed limit monitoring device

    CHEN CHANGFU / XIA FENGNIAN / SUN LI et al. | European Patent Office | 2015

    Free access