Each related index was compared in three specifications, including Fundamental code for design on railway bridge and culvert, Code for rating existing railway bridges, and Code for design of high speed railway. The reasons of the difference existed in indexes was revealed, especially between high speed railway bridge and normal speed railway bridge.
Research on Railway Bridge Evaluation Index
Advanced Materials Research ; 838-841 ; 1126-1129
2013-11-08
4 pages
Article (Journal)
Electronic Resource
English
Railway research engineering index
TIBKAT | Nachgewiesen 1959 - 1963
Engineering Index Backfile | 1956
Engineering Index Backfile | 1931
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1956