When the shield tunnel go through the bridge structure of high speed railway, it will affect the high speed railway bridge structure, thus influence to the bridge of track structure and ballastless track. Based on the Beijing subway tunnel go through the Beijing-Shanghai railway bridge section engineering examples, for the first time to shield under through the high speed railway caused the bridge pier settlements are analyzed. Combined with the actual monitoring data, the isolation pile during the period of construction bridge pier and Shield during through bridge pier during the period of settlement regularity of construction bridge pier, settlement regularity of Isolation pile as well as settlement regularity of the surface land are summarized analysis. During the construction of high-speed rail bridges and the soil to produce a certain degree of deformation, Shield Zone just above the soil settlement with a large deformation, both sides of the deformation gradually decreases, but the deformation is controlled. The use of the isolation pile reinforcement measures significantly reduced the influence by the Shield Construction and it can satisfy the requirement of high speed railway control standards


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Settlement Control and Impact Analysis of the Subway Shield Under-Passing Beijing-Shanghai High Speed Railway Bridge



    Published in:

    Applied Mechanics and Materials ; 226-228 ; 1655-1660


    Publication date :

    2012-11-29


    Size :

    6 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English





    Beijing-Shanghai high-speed railway project

    Scientific and Technological Information Research Institute, MOR 2 Daliushu Road, Xizhimenwai CN - 100704 Beijing | IuD Bahn | 2008



    Test Evaluation of Post-Construction Settlement of Subgrade in Beijing-Shanghai High-Speed Railway

    Zeng, Juncheng / Zhang, Jiwen / Tong, Xiaodong et al. | ASCE | 2009


    Test Evaluation of Post-Construction Settlement of Subgrade in Beijing-Shanghai High-Speed Railway

    Zeng, J. / Zhang, J. / Tong, X. et al. | British Library Conference Proceedings | 2009