The comprehensive window maintenance setting program of the high-speed railway is the technical measure to address the conflict between trains running on and construction equipment maintenance. In the conditions of high speed and density traffic, the creation program of skylight has a restraining effect on the capacity of high-speed railway and the running of off-line trains and the sunset departure and sunrise arrival trains. Upon the comparison of different characteristics and strengths and weaknesses of skylights, this paper analysis operation plan of the Beijing-Shanghai high-speed railway and the characteristics passenger flow, then it calculates the capacity and the loss by different skylight programs. So consider opening sub-rectangular skylight recommendations.
The Reasonable Mode of Skylight on Beijing-Shanghai High-Speed Railway
Third International Conference on Transportation Engineering (ICTE) ; 2011 ; Chengdu, China
ICTE 2011 ; 2637-2642
2011-07-13
Conference paper
Electronic Resource
English
Beijing-Shanghai high-speed railway construction
IuD Bahn | 2011
|Beijing-Shanghai high-speed railway project
IuD Bahn | 2008
|Construction of Beijing-Shanghai high-speed railway commenced
IuD Bahn | 2008
|A Study of Exploitation Mode for High Speed Railway Between Beijing and Shanghai
British Library Conference Proceedings | 1998
|