The comprehensive window maintenance setting program of the high-speed railway is the technical measure to address the conflict between trains running on and construction equipment maintenance. In the conditions of high speed and density traffic, the creation program of skylight has a restraining effect on the capacity of high-speed railway and the running of off-line trains and the sunset departure and sunrise arrival trains. Upon the comparison of different characteristics and strengths and weaknesses of skylights, this paper analysis operation plan of the Beijing-Shanghai high-speed railway and the characteristics passenger flow, then it calculates the capacity and the loss by different skylight programs. So consider opening sub-rectangular skylight recommendations.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    The Reasonable Mode of Skylight on Beijing-Shanghai High-Speed Railway


    Beteiligte:
    Zhou, Wei (Autor:in) / Lin, Yujun (Autor:in)

    Kongress:

    Third International Conference on Transportation Engineering (ICTE) ; 2011 ; Chengdu, China


    Erschienen in:

    ICTE 2011 ; 2637-2642


    Erscheinungsdatum :

    13.07.2011




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Beijing-Shanghai high-speed railway project

    Scientific and Technological Information Research Institute, MOR 2 Daliushu Road, Xizhimenwai CN - 100704 Beijing | IuD Bahn | 2008




    A Study of Exploitation Mode for High Speed Railway Between Beijing and Shanghai

    Han, B. / Wang, S. / Sun, Q. et al. | British Library Conference Proceedings | 1998