New interior decorations and arrangements incorporated in two trains for Waterloo-Bournemouth-Weymouth services; each consists of 11 renovated vehicles 59 ft long over body; and gives accommodation for 102 first class and 408 third class passengers; total weight 352 tons; coaches are of semi-steel construction, mounted on steel underframes carried on standard trucks. (See also - Editorial comment p 195)
Modernised trains, Southern railway
Ry Gaz
Railway Gazette ; 69 , n 5
1938
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Modernised trains, Southern railway
Engineering Index Backfile | 1938
Modernised trains for Liverpool overhead railway
Engineering Index Backfile | 1947
High speed & tilting trains - Inside Industry - Montréal works modernised
Online Contents | 2000
Waterloo and City railway: rolling stock modernised
Engineering Index Backfile | 1940
British Library Online Contents | 2000