New interior decorations and arrangements incorporated in two trains for Waterloo-Bournemouth-Weymouth services; each consists of 11 renovated vehicles 59 ft long over body; and gives accommodation for 102 first class and 408 third class passengers; total weight 352 tons; coaches are of semi-steel construction, mounted on steel underframes carried on standard trucks. (See also - Editorial comment p 195)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Modernised trains, Southern railway


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Erscheinungsdatum :

    1938


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Modernised trains, Southern railway

    Engineering Index Backfile | 1938


    Modernised trains for Liverpool overhead railway

    Engineering Index Backfile | 1947




    Montreal works modernised

    British Library Online Contents | 2000