Railroad has made installation of centralized traffic control which includes important junction, wye connections, crossovers, and end of double track as well as 12.6 track miles, all in general vicinity of Ninevah, NY; detailed description of project.
C.T.C. extended on Delaware and Hudson
Ry Signaling
Railway Signaling ; 41 , n 10
1948
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1943
Engineering Index Backfile | 1947
Engineering Index Backfile | 1943
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1947
|