Standard track construction 7-in. T. girder rail with 7-in. grooved girder rail for curves; standard tracks for brick paving, and for concrete paving; track on wood ties; track with grooved girder rails; methods of track reconstruction; city and company cooperation. (See also Eng. News-Rec vol. 101, no. 10, Sept. 6, 1928 pp. 350-352, 6 figs)
Rebuilding street railway track at Cincinnati
Am. City
American City ; 39 , n 4
1928
2 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rebuilding street railway track at Cincinnati
Engineering Index Backfile | 1928
Track construction of the Cincinnati Street Railway Company
Engineering Index Backfile | 1899
Cincinnati street railway opens suburban line
Engineering Index Backfile | 1931
Shops of the Cincinnati street railway company
Engineering Index Backfile | 1897
Rebuilding a railway from the track up
Engineering Index Backfile | 1930
|