Standard track construction 7-in. T. girder rail with 7-in. grooved girder rail for curves; standard tracks for brick paving, and for concrete paving; track on wood ties; track with grooved girder rails; methods of track reconstruction; city and company cooperation. (See also Eng. News-Rec vol. 101, no. 10, Sept. 6, 1928 pp. 350-352, 6 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Rebuilding street railway track at Cincinnati


    Additional title:

    Am. City


    Published in:

    American City ; 39 , n 4


    Publication date :

    1928


    Size :

    2 pages


    Remarks:

    6 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Rebuilding street railway track at Cincinnati

    Engineering Index Backfile | 1928



    Cincinnati street railway opens suburban line

    Engineering Index Backfile | 1931


    Shops of the Cincinnati street railway company

    Engineering Index Backfile | 1897


    Rebuilding a railway from the track up

    Robertson, W.R. | Engineering Index Backfile | 1930