Machinery installation and developments indicated for later stage; 585-hp. Beardmore Tornado oil engines; engine starting; variable-pitch airscrews; thrust wire; evaporative engine cooling; exhaust boiler; auxiliary machinery; lubricating oil system; gantry tests; fuel storage system; pipe fittings; fuel specification; water recovery; hydrogen as auxiliary fuel; gaseous fuel. Paper presented at Joint Meeting with Instn. Automobile Engrs. (See also - (discussion) p 194-206, 15 figs partly on supp. sheet.; abstract in Automobile Engr., vol. 19, no. 251, Feb. 1929, pp. 74-78, 9 figs; Instn. Automobile Engrs. -- Proc., vol. 23, 1928-29, pp. 99-123, 13 figs)
The machinery installation of airship R 101
Roy. Aeronautical Soc. -- Jl
Royal Aeronautical Society -- Journal ; 23 , n 219
1929
20 pages
15 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Airship machinery: Past experience and future requirements
Engineering Index Backfile | 1920
|Propulsion gear installation in airship Graf Zeppelin
Engineering Index Backfile | 1931
|