Enlargement of service to include through passenger and freight traffic; single-phase, 25 cycle, 12/36-kv., three-wire system, as finally decided upon, consists essentially of frequency-changer station at Wayne Junction to be owned by Philadelphia Electric Co.; initial peak load, in suburban zone, will approximate 9000 kw. or 13,000 kva.; frequency-changer station; distribution system; multiple-unit cars; traction motors; control and auxiliary equipment.
Reading-Philadelphia suburban electrification
Gen. Elec. Rev
General Electric Review ; 34 , n 3
1931
7 pages
13 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reading company's Philadelphia suburban electrification making rapid progress
Engineering Index Backfile | 1930
|Reading company's Philadelphia suburban electrification making rapid progress
Engineering Index Backfile | 1930
|Reading suburban electrification
Engineering Index Backfile | 1930
Operating experience with supervisory control on Reading-Philadelphia suburban electrification
Engineering Index Backfile | 1932
|Cars for reading suburban electrification
Engineering Index Backfile | 1931
|