Installation of centralized traffic control placed in service on 112 mi of single track between Akron, Colo, and Denver; 105-mi section between Akron and Derby controlled from one machine at Brush, Colo; installation includes continuous indication of location of all trains on main tracks, automatically controlled electric switch locks on certain hand throw mainline switches, and specially constructed cable for line code circuit. (See also Ry Signaling v 31 n 2 Feb 1938 p 83-95)
C.T.C. On complete subdivision of Burlington
Ry Age
Railway Age ; 104 , n 9
1938
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
C.T.C. On complete subdivision of Burlington
Engineering Index Backfile | 1938
|C.T.C. On complete subdivision of Burlington
Engineering Index Backfile | 1938
|C.T.C. On complete subdivision of Burlington
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1947
|How Burlington simplified C.T.C. for light-traffic single track
Engineering Index Backfile | 1951