Description of installation and operation; unusual feature of system is that apart from computer programming, relatively little preliminary traffic planning is required, since development work is done by computer itself once first detectors are operating; computational procedures used in determining operational parameters for traffic responsive system, timing requirements for one signal, and change point for remaining phase of signal forming part of traffic responsive system.
Toronto installs all-purpose electronic computer for traffic signal control
Traffic Eng Control
Traffic Engineering and Control ; 5 , n 10
1964
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pennsylvania installs centralized traffic control
Engineering Index Backfile | 1942
Pennsylvania installs centralized traffic control
Engineering Index Backfile | 1942
Canadian pacific installs centralized traffic control
Engineering Index Backfile | 1944
Delaware and Hudson installs centralized traffic control
Engineering Index Backfile | 1937
St. Louis-southwestern installs centralized traffic control
Engineering Index Backfile | 1944