Centralized traffic control installed on 8 mi of double track and 26 mi of single track main line between Poplar Bluff, Mo, and Knobel, Ark; section is bottle neck for trains to and from two routes at each end; 37 signals for directing train movements and 16 power switch machines controlled by General Railway Signal Co's Type-F, Class-M, coded system, using three line wires. (see also Ry Age v 102 n 23 June 5 1937 p 938-42)
Missouri pacific installs C.T.C. on 34 miles
Ry Signaling
Railway Signaling ; 30 , n 6
1937
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Missouri pacific installs C.T.C. on 34 miles
Engineering Index Backfile | 1937
Missouri Pacific installs C.T.C. on 82.66 miles of single track
Engineering Index Backfile | 1950
Missouri Pacific installs C.T.C. on 82.66 miles of single track
Engineering Index Backfile | 1950
Frisco installs C.T.C. on 42 miles
Engineering Index Backfile | 1945
Frisco installs C.T.C. on 42 miles
Engineering Index Backfile | 1945